affected by the route in each district.
Heavy freight traffic from JNPT will no longer need to enter Thane or Mumbai, significantly reducing local pollution and jams.
Approximately 96.41 km long, this segment connects the Mumbai-Ahmedabad Highway (NH-48) to Balavali in Raigad. virar-alibaug multimodal corridor route map
The following visualization illustrates the multi-sectional route breakdown of Phase 1 from Navghar (Virar) down toward the southern expressways, highlighting key interchange transitions and geographic markers along the corridor's footprint. Detailed Route Map & Alignment Breakdowns
The VAMC is a major infrastructure project aimed at connecting Virar in the Palghar district to Alibaug in the Raigad district. Initially conceived by the Mumbai Metropolitan Region Development Authority (MMRDA) in 2011, the project was later handed over to the Maharashtra State Road Development Corporation (MSRDC) in September 2020 to expedite construction. This project is not just a road; it is designed to include: affected by the route in each district
Virar Alibaug Multimodal Corridor: Route & Status (2026)
All You Need to Know About Virar Alibaug Multimodal Corridor This project is not just a road; it
Covering 29.9 km , this southern stretch connects Balavali to the coastal town of Alibaug, providing crucial access to tourism and residential areas. 3. Key Intersections and Connectivity
The Virar-Alibaug Multimodal Corridor is a revolutionary infrastructure project that aims to transform the transportation landscape of Mumbai's western suburbs. The project, which is currently in the planning stages, promises to bring about a significant reduction in travel time, congestion, and pollution in the region. In this article, we will explore the Virar-Alibaug Multimodal Corridor route map, its features, benefits, and what it means for the future of transportation in Mumbai.