Pwd Dsr 2017-18 Maharashtra [better] Jun 2026

The PWD DSR 2017-18 for Maharashtra is a vital document that provides a comprehensive guide to construction costs in the state. It is essential for government agencies, contractors, builders, and developers to access this document to plan and execute infrastructure projects efficiently.

This is the most referenced section. Rates are provided for:

The 2017-18 edition was widely digitized as an "e-DSR" to ensure standardized access across all regional divisions, including Mumbai, Pune, Nashik, Nagpur, Aurangabad, and Amravati. It categorizes construction items systematically into distinct operational chapters: Maharashtra PWD Schedule of Rates 2017-18 | PDF - Scribd

: Charges for minerals like sand and rubble were generally not included in the basic rate analysis and had to be added separately based on Revenue Department notifications. Labour Welfare

: Engineers use these predefined baseline metrics to generate accurate cost abstracts. pwd dsr 2017-18 maharashtra

In a small PWD office in Pune, a young Junior Engineer named Raj sat with a massive stack of blueprints. He was tasked with estimating a new rural hospital, but the old rates from 2016 wouldn't do. He opened the 2017-18 DSR and found the secrets he needed: The Foundation

: The 2017-18 DSR included detailed calculations for "leads"—the distance materials must be transported. Rates typically included an initial 5km lead for most completed items. Structure of the Document

: Superintending Engineers were given localized powers to map out specific villages heavily impacted by active coal or mineral mining operations to allocate distinct rate bumps to counter high localized labor costs. Lead and Lift Charges: The Logistics Math

The state-level framework established a standardized pricing baseline for key construction commodities. Contractors and government departments utilized these baseline figures as the starting point for all item rate analyses: Maharashtra PWD Schedule of Rates 2017-18 | PDF - Scribd The PWD DSR 2017-18 for Maharashtra is a

The Analysis of Rates (AoR) document, which accompanies the DSR, explains how the rates were derived. For the 2017-18 edition, key assumptions were:

Executing a construction project in a highly developed metropolitan city or a dense forest area requires fundamentally different logistics than working in flat rural terrain. To adjust for this, the 2017-18 DSR integrated a clear system of that offered a percentage premium increase over normal scheduled rates:

These rates applied to all districts across the state of Maharashtra for the financial year 2017-2018.

: A specific breakdown of unit costs for materials such as cement, steel, and paint. A reference copy is available at Scribd - Maharashtra PWD Material Rates . Rates are provided for: The 2017-18 edition was

This introductory section outlines the basic assumptions made while calculating rates, including initial lead distances for materials, water charges, and safety compliances. 2. Material Rates (Basic Rates)

: Set at a baseline of ₹4,200 per Metric Ton (M.T.) .

For 2017-18, the Maharashtra PWD was allocated in the state budget. The DSR’s actual expenditure breakdown was revealing: