Pwd Dsr 2015-16 Maharashtra ❲2026 Edition❳

Do you have a copy of the original 2015-16 Nagpur zone schedule? Let us know in the comments below.

Compared to its predecessor (DSR 2013-14), the 2015-16 edition introduced several significant changes:

Detailed Overview of Maharashtra PWD DSR 2015-16: Schedule of Rates for Construction Projects

In the realm of public works and infrastructure development, standardization is the bedrock of transparency, fairness, and efficiency. For the state of Maharashtra, one of India’s most industrially advanced regions, the Public Works Department (PWD) plays a pivotal role in building roads, bridges, government buildings, and irrigation projects. Central to this ecosystem is the . Pwd Dsr 2015-16 Maharashtra

: Up to 15% increase for works inside specialized facilities like jails or hospitals.

Ongoing or disputed projects from that era are still audited against the rates prevalent at the time of the tender.

: Approximately ₹42,875 to ₹45,410 per M.T.. Bitumen (VG-10 Bulk) : Approximately ₹41,500 per M.T.. Percentage Increases for Specific Conditions Do you have a copy of the original

The DSR is not just a list of material rates. It provides detailed specifications for thousands of construction items, from demolition to finishing. The following table shows a selection of items with their corresponding DSR references and rates to illustrate this specificity:

All PWD divisions, sub-divisions, and government tendering authorities within the district.

| Material | Rate (Per M.T. unless specified) | | :--- | :--- | | | ₹ 6,500 / M.T. | | Mild Steel / T.M.T. Bar | ₹ 48,496 / M.T. | | Bitumen (Packed) 30/40 Grade | ₹ 61,646 / M.T. | | Bitumen (Bulk) 30/40 Grade | ₹ 57,956 / M.T. | | II Class Burnt Bricks | ₹ 7,000 / per 1000 nos. | | Ordinary Sand | ₹ 846 / per m³ | | Crushed Sand | ₹ 616 / per m³ | For the state of Maharashtra, one of India’s

To account for local challenges, standard rates were subject to percentage increases: Corporation Areas: +5% [3]. Tribal or Hilly/Inaccessible Areas: +10% [3, 6]. Sugarcane Factory Radius (10km): +5% [3].

Included for natural minerals like sand, rubble, and metal.